KitLog pro

Powered By Kitlog Pro v2.0

Tony’s RV-7
' style=
Date:  5-16-2020
Number of Hours:  3.25
Manual Reference:  Section 6
Brief Description:  Right Elevator

Fabricated the two doublers for the L/R elevators. These will go inside of the root rib as mentioned in the last log entry.

Right elevator - Cleco'd and drilled the elevator horn to the spar and root rib. Disassembled the elevator; deburred skeleton, cleaned edges, countersunk and dimpled spar, dimpled root rib, beveled the counterbalance skin.
' style=

Elevator control horn doublers

Elevator control horn doublers

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.