|
|
Tony’s RV-7
|
Date: 11-6-2019
|
Number of Hours: 6.37
|
Manual Reference: Section 6
|
Brief Description: HS - Preparing ribs and drilling left HS.
|
|
Notched HS-00006 ribs; Prepping HS-00006, HS-00005, HS-706, HS-707 and HS-708 ribs; Marked/labeled ribs; marked and drilled HS-00006 aft flange; marked centerline on HS-00005; Cleco'd, drilled to #30, disassembled, deburred, re-cleco'd HS-706, HS-707, HS-708 (except aft fange) rib to spar attach hole; Cleco'd left side HS-601PP skin to HS skeleton; Enlarged left side HS-708 to HS-603PP holes to #21; Cleco'd left side HS-00001, HS-710 and HS-714 to left-front spar.
|
|
|
|
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |