Right Elevator - Trimmed counter weight. Will need to final trim after final installation and paint; finished riveting all of the right elevator; rolled and blind riveted the leading edge, added blind rivets between the other rivets in the outer leading edge roll to pull everything together.
Left Elevator - Match drilled spar doublers; deburred spar; beveled the top edge of the leading edge skin.