Brief Description: Riveted elevator, started to drill horizontal stab
Today we finished riveting the elevator, working very carefully this time with a cleco-rivet 1-out/1-in method to avoid any twist being built in like the previous one.
Then, now knowing that Zenith said the variance from the angle of attack tolerance we had on the horizontal stabilizer was completely fine, the holes for the mounting bolts were pilot drilled and clecoed so I didn't have to worry about the clamps staying in place anymore. We mocked up the elevator on the tail as well for the sake of making sure everything fit and cleared.