KitLog pro

Powered By Kitlog Pro v2.0

Adam's CH750 Cruzer
' style=
Date:  7-15-2018
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Pitot tube and plumbing installed

The pitot tube mast was cut to fit, drilled out and riveted to the skin. Pitot tube was then installed in the mast (still need to drill set screws), and tubs were cut down to fit inside the wing. The plumbing for the pitot and AOA was secured to the tubes, and the pitot heat controller was connected to the pitot tube and secured to a rib where it will be accessible via inspection port.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.