KitLog pro

Powered By Kitlog Pro v2.0

Richard's Web Site
' style=
Date:  10-19-2015
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Move to paint shop

Put fuselage, center section and vertical stabilizer into 26' U-haul truck to transport to painter.

I attached temporary wheels to the gear which were only slightly larger than the door width of the truck. The fuselage is 24' long which is about the same as the length of the truck bed but the fuselage fit because the main gear raises the nose and thus increases the useful length of the truck
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.