Powered By Kitlog Pro v2.0
Richard's Web Site
AirCam
Fabric
5-12-2015
< Previous Log Entry
Next Log Entry >
Date:
5-12-2015
Number of Hours:
0.00
Manual Reference:
Brief Description:
Application of fabric to Rudder
Shows HS's with fabric application completed. These will be primed and painted in final colors- if I ever make a "final" decision on the colors.
Used same techniques to apply fabric to rudder. The rudder is not symmetrical so it is a bit tricky to get the fabric to shrink in the desired way.
Picture 3 show the completed rudder including the placement of the pinking tape.
We completed fabric application to HS and Rudder in about 3.5 to 4 hours.
HS fabric completed
Detail of fabric on Rudder
Rudder completed
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
AirCam Home
Category
# Logs
# Hours
All
246
720
Ailerons
2
10
Attaching and Riging
8
17
Brakes
1
2
Center Section
30
64
Electrical
17
58
Elevator
20
52
Engine
30
105
Fabric
14
19
Flaps
3
8
Fuselage
3
18
General Remarks
1
0
Horizontal Stabilize
23
73
Instruments
13
37
Miscellaneous
2
4
Move to HND
3
8
Paint
9
34
Prop
1
3
Rigging
8
17
Rudder
6
20
Shop Supplies
1
6
Throttle controlls
2
6
Throttle controls
2
6
Vertical Stabilizer
21
62
Wings
23
79
Wiring
3
12
Copyright © 2001-2024 Matronics. All Rights Reserved.