Powered By Kitlog Pro v2.0
RV-8 Build Log
RV-8
All
1-26-2019
< Previous Log Entry
Next Log Entry >
Date:
1-26-2019
Number of Hours:
2.50
Manual Reference:
Brief Description:
Horizontal Stab Finished!
After the previous TC visit/inspection, I was now able to close out the horizontal stab by riveting in the rear spar assembly. This took a bit longer than I had thought and had to replace three rivets in total that I wasn’t happy with.
Overall, very happy with the finished product!
Finised!
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
103
217
Empennage
84
190
Finish/Paint
1
0
Practice Project
13
23
Research
3
2
Tools
1
2
Wings
1
Copyright © 2001-2024 Matronics. All Rights Reserved.