KitLog pro

Powered By Kitlog Pro v2.0

Lancair Legacy FG-6
< Previous Log Entry          Next Log Entry >
' style=
Date:  9-15-2005
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Block grind out (day one)

Because the center wing section is used in the building of the RG version, we had to cut out the over center link support blocks and grind them away. This was a huge job
' style=





' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.