KitLog pro

Powered By Kitlog Pro v2.0

Lancair Legacy FG-6
' style=
Date:  9-16-2005
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Horizontal Stab fitting

Leading edge bids are sanded on both the Horizontal stab and the elevators. The elevators are fit to the stab and the seam between the two are painstakingly fit. This requires installing and removing the elevators about 100 times and it still will wait until final assembly for the finaly fit and sanding/micro
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.