KitLog pro

Powered By Kitlog Pro v2.0

Lancair Legacy FG-6
' style=
Date:  3-17-2006
Number of Hours:  12.00
Manual Reference:  
Brief Description:  Final Panel layout and off to the metal shop

I spend *way* too much time working on getting the panel layout just right. However, even tho it was a lot of time, I really like how it turned out. It's off to the metal shop now. I'll end up with a sub assembly with frame, panels laser cut, powder coated, silkscreened, and the radio stack assembled with trays installed. It will come back to me for final assembly and wiring.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.