KitLog pro

Powered By Kitlog Pro v2.0

Waynes RV8 Project
< Previous Log Entry          Next Log Entry >
' style=
Date:  3-15-2010
Number of Hours:  1.20
Manual Reference:  6-13
Brief Description:  Drill bushing

Aligned the trailing edge of the stabilizer and secured it. Borrowed "drill bushing" from Mark Ziegler nad inserted. Pilot drilled. Removed elevator from horizontal stabilizer and drilled the WD-605-1-R to final size.
' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.