KitLog pro

Powered By Kitlog Pro v2.0

Waynes RV8 Project
' style=
Date:  11-20-2008
Number of Hours:  1.30
Manual Reference:  6-2
Brief Description:  Match drilled ribs to spar

Drilled all ribs to spars. Did not drill side attach point that takes a 3/32 rivet. Unclecoed. Deburred and cleaned out chips.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.