KitLog pro

Powered By Kitlog Pro v2.0

ALBERT'S WEB SITE
' style=
Date:  5-4-2007
Number of Hours:  2.00
Manual Reference:  6B23
Brief Description:  Elevator cables

Finished refabricating bottom elevator cable. Installed cable, checked rig and throws and safetied bolts with cotter pins. Turnbuckles have to be safetied and cable tension checked. The tension feels good but will check.
Rehooked up and torqued static line between Altimeter and Air speed indicator. Had to shorten that line to accomodate new position.
Still have LRI lines and Artificial horizon lines to fabricate and install. The venturi for the horizon will go on the L.H. side cowl so the lines will be short. The LRI lines will go out the right side with bulkhead fittings on the side skin then out the wing similiar to the pitot static lines on the left wing.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.