Date:  8-23-2006
Number of Hours:  2.00
Manual Reference:  6B23
Brief Description:  Control cables

Upper elevator control cable was hitting aileronn torque tube arm at full rt aileron.
Made a new fairlead to keep it free.
Installed and checked controls.
Started wiring Nav and strobes.
' style=

Still close so moved next fairlead hole

Still close so moved next fairlead hole

' style=

Moved the cable to right a bit

Moved the cable to right a bit

' style=

This is full deflection stopped by control stick

This is full deflection stopped by control stick