Greased wheel bearings and installed left wheel. Gear attach fittings all secured, bolts and rivets. Aircraft lowered to the ground. Had to do it little by little, all by myself. 30 lbs of air in the tires, will check in a week or so to see how they are holding up. Still have to safety brake pad holders, both sides. Have to drill and cotter pin both gear attach fittings