Had removed canopy rails for zinc chromating and painting, reinstalled. The struts are hard to reinstall because of the pressure in the struts. Dafetied them in the compressed mode and installed. Installed the two Bosch blue coils on the cabin Rt side of firewall. Have to figure out where to put the switcher, would like to put it as close as possible to the coils. Ordered cable and DNC connectors for the VHF and ELT antennas. Wiring all checked good again after messing with and securing bundles.