KitLog pro

Powered By Kitlog Pro v2.0

ALBERT'S WEB SITE
' style=
Date:  11-27-2006
Number of Hours:  2.00
Manual Reference:  6G3
Brief Description:  Installing gear

Finished milling out cutouts for gear brackets.
Installed gear with rubber hoses installed.
Riveted the lower rivets and installed the lower rear gear brackets to make sure I
could get at them.
Zinc chromated the gear channel and the strut.
Now I can rivet the forward skins, most of the interior work is done (wiring, control cables, etc..)
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.