Worked dual stick set-up. Installed vertical braces, have to install both bottom bolts Made fwd bearing bkt, can't install, don't have the height yet. Will have to wait to set up the fwd and aft fuselae assy for top longerons to make sure the torque tube is level. Rigging push rods still has to be done. Used a copper pipe flattened around a fairmount wrench to get the top bolts inside the spar webs.
A fairmount wrench and copper tube worked well
Both bottom bolts have to be done, used 3 A5 rivets also