KitLog pro

Powered By Kitlog Pro v2.0

ALBERT'S WEB SITE
' style=
Date:  2-23-2006
Number of Hours:  2.00
Manual Reference:  6B7
Brief Description:  Rudder fairlead

Drilled side of side skins for rudder cables and fitted and drilled housing.
Deburred and zinc chromated the rear vertical L braces.
Laid out nose gear housing and checked for parts for the spar jigs.
Ordered four saw horses from Harbor Freight will have to movre fuselage from work bench.
Will try putting it in basement long ways.
Need to make sure center line is from nose to tail.
Can't do much more without placing the fwd and aft pieces together.
Drilled aft bearing for control torque tube.
' style=

Fitted teflon to housing

Fitted teflon to housing

' style=

Cut out for rudder cables

Cut out for rudder cables

' style=

Rear bearing for control torque tube

Rear bearing for control torque tube

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.