Wendells RV-6A
' style=
Date:  9-19-2023
Number of Hours:  2.00
Manual Reference:  ElectroAir Install
Brief Description:  Replace Key Switch

All previous wiring was marked which made the swapping easier. I had to add a power wire from VPX to the EIS panel switch to feed the controller unit. The Coil Pack also needed a VPX wire to feed those coils. Removed the key switch, marked and cut out the enlarged replacement switch panel opening. The nearby panel area had 6 switches (one unassigned). I had to rearrange the remaining 5 by drilling a new single hole below the originals. So I now have Master and Avionics on top, then Co-pilot Stick Ground and APRS below and finally Alternate Static on the bottom.
' style=

The right P-Lead and P-lead shield get removed. The right Tach gets spliced to the EIS tach wire.

The right P-Lead and P-lead shield get removed. The right Tach gets spliced to the EIS tach wire.

' style=

New cutout will encroach on the top two switches.  All need rearranging.

New cutout will encroach on the top two switches. All need rearranging.

' style=

Rearranging complete.

Rearranging complete.

' style=