KitLog pro

Powered By Kitlog Pro v2.0

Wendells RV-6A
' style=
Date:  7-22-2020
Number of Hours:  5.00
Manual Reference:  Right Wing
Brief Description:  Fuel Vent and Fuselage Openings

Only two wires go through this wing. Landing light and a twisted, shielded 2 wire set for the Nav and Strobe lights. I drilled a 1/8" fuselage hole for a rubber bushing to snug them up. The fuel tank line goes through a 1 inch diameter hole and double rubber bushings. Lubricate the two bushings to squeeze into the opening from each side of the fuselage skins. Finally, I hand coiled the 1/4 inch fuel vent line 3 3/4 wraps and added the hardware for connection to the tank and to the vent outlet. I drilled a 7/16 hole in the lower fairing and secured the vent outlet. I'll add some tie wraps to keep the encased coils solid inside the black sheathing. Finally, I added another 1/8'' hole, aft of the fuel tank/fuselage attach angles to accomodate the single fuel level wire.
' style=

Small .125 hole for Nav/Strobe light and landing light.

Small .125 hole for Nav/Strobe light and landing light.

' style=

1.0 inch hole for rubber fuel tank bushings went here.

1.0 inch hole for rubber fuel tank bushings went here.

' style=

Fuel vent hand-coiled and encased in sheathing.

Fuel vent hand-coiled and encased in sheathing.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.