KitLog pro

Powered By Kitlog Pro v2.0

Wendells RV-6A
< Previous Log Entry          Next Log Entry >
' style=
Date:  7-10-2020
Number of Hours:  8.00
Manual Reference:  Heated Pitot
Brief Description:  Final Install

Its time to finish and secure the pitot, heated pitot controller, and access cover. The wiring is coiled and secured from movement and the heated controller is screwed in place. It rests right above the access plate cover. So, there it is, all assembled and it works when I turn on the heated pitot.
' style=

Wires are secured, connections shrink wrapped, and ready to mount.

Wires are secured, connections shrink wrapped, and ready to mount.

' style=

Controller in place, secured with 3 flush size 6 screws into nutplates.

Controller in place, secured with 3 flush size 6 screws into nutplates.

' style=

No more work to do at this location.

No more work to do at this location.

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.