Brief Description: Drilling the vertical stabilizer
Clecoed the VS-808PP spar doubler to the VS-803PP rear spar. Clecoed the hinge brackets VS-410PP, VS-411PP and VS-412PP. Back-drilled the six hole pattern of the upper VS-410PP using the holes in the spar channel and spar doubler as drill guide. Prepared the ribs VS-704, VS-705, VS-706 and VS-707 and clocoed them to the front and rear spars. Final drilled #30 VS-808PP, VS-410PP,VS-411-PP and VS-412PP to VS-803PP. Drilled all rib to spar attach holes to #30 Clecoed on the VS-801PP skin Drilled / match drilled all the holes attaching the skin to final size