KitLog pro

Powered By Kitlog Pro v2.0

JAMESs Web Site
' style=
Date:  2-20-2019
Number of Hours:  3.00
Manual Reference:  15.2.7
Brief Description:  Trim box trimmed and 2 bids on it for mounting fla

The trim box was released from the cardboard box after completely cured. I timed it and prepped with sand paper for the flanges to go on. I duct taped everything and waxed the tape so it will come off better when cured. Peel-ply next and let it sit to cure. The heat gun was used to flow out the resin and help with the peel-ply absorption with the extra resin.

I will pain the box and screw it on when the carpet is installed.
' style=

Trimmed and fitted.

Trimmed and fitted.

' style=

2 bid flange in place

2 bid flange in place

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.