KitLog pro

Powered By Kitlog Pro v2.0

JAMESs Web Site
' style=
Date:  1-11-2014
Number of Hours:  7.00
Manual Reference:  9.3.2
Brief Description:  Bid in bulkheads and fuel out let

My morning started with micro-glassing in the back pick up tube and fitting the back bulkhead which was bid in place. I am trying bid tape that another builder told me about Bob Huntingford from Camrose AB WOW it speeds the time up and so nice to work with. There is a learning curve to any thing new. I will soon be on top of the new tape with the results I wont. The tape is surged on both sides and one side is thicker them the other so this one has to be down (horizontal) and the other side up to lay down correct. The gravity of Planet Earth pulls the resin down a bit from the top so with the thicker side down it fills in nice with the peel-ply used. It was a good day of work on the plane.!!
' style=

Back fuel tank line resined in place

Back fuel tank line resined in place

' style=

Back bulkhead with 2 bid in place

Back bulkhead with 2 bid in place

' style=

Baggage bulkhead in. Plastic under the clamps

Baggage bulkhead in. Plastic under the clamps

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.