Powered By Kitlog Pro v2.0
JAMESs Web Site
VELOCITY- XLRG
Engine/Propeller
4-17-2018
< Previous Log Entry
Next Log Entry >
Date:
4-17-2018
Number of Hours:
2.00
Manual Reference:
12.4.2
Brief Description:
Heat cowling to fit hinges.
The top did not fit after the hinge was riveted into place. So out came the heat and after 18 minutes of heat and working the pin up the hinge to fit it was hot enough and was ready to turn off the lights. The next day it worked great.
Heat lamp cooking.
Only 18 minutes to do this cook to fit.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
VELOCITY- XLRG Home
Category
# Logs
# Hours
All
847
2528
Brakes
3
10
Bulkheads
1
1
Canard/Elevator
49
122
Control System
17
58
Doors/Windows
78
192
Electrical/Instrumen
21
66
Engine/Propeller
141
432
Fairings
10
34
Filling to priming
155
533
Final Assembly/Finis
1
2
Fuel System
137
407
Fuselage
75
194
Inspections
1
1
Instrument Panel
7
20
Interior
52
192
Kit Purchase/Conditi
2
26
Landing Gear/RG
30
103
Painting
2
8
Shop
5
16
Time away from build
18
Tools
2
5
Wheels/Axles
4
10
Wings/Winglets
36
96
Copyright © 2001-2024 Matronics. All Rights Reserved.