KitLog pro

Powered By Kitlog Pro v2.0

JAMESs Web Site
' style=
Date:  11-8-2017
Number of Hours:  2.00
Manual Reference:  12.4.2
Brief Description:  Bid the bottom to the top cowling

The bottom and the top will be joined and then a line cut in flow with the bottom of the cowling. 3 hinges will be used to hold the cowling onto the wing and it’s self.
' style=

Duct tape to have bids lay flat

Duct tape to have bids lay flat

' style=

3 bids (glass) inside of cowling

3 bids (glass) inside of cowling

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.