KitLog pro

Powered By Kitlog Pro v2.0

JAMESs Web Site
' style=
Date:  1-1-2013
Number of Hours:  2.00
Manual Reference:  12.2.6
Brief Description:  More heater work

I primed the inside of the out flow, bolted on the down duct and all that good stuff. Then I had to finish up the pivot and scat tubing. I will be attaching the tubing with clamps to the bulk head when the order comes in from Aircraft spruce ..
' style=

Getting there

Getting there

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.