KitLog pro

Powered By Kitlog Pro v2.0

JAMESs Web Site
' style=
Date:  5-11-2013
Number of Hours:  3.50
Manual Reference:  6.2.3
Brief Description:  Milled fiber in hard points with 3 bid

Saturday morning I mixed up milled fiber and resin and installed all the hard points. I then did a 3 bid lay-up on all the points. Next was peel-ply on all the hard points. When I pressed the hard points into place the center hole had resin ooze out and that had to be removed. I a few days I will re-drill the 3/8” hole and tap for the 7/16” fine thread bolts.
' style=

Milled fibered into place.

Milled fibered into place.

' style=

3 bid on all hard points.

3 bid on all hard points.

' style=

Peel-ply on hard points.

Peel-ply on hard points.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.