Powered By Kitlog Pro v2.0
JAMESs Web Site
VELOCITY- XLRG
Filling to priming
2-1-2019
< Previous Log Entry
Next Log Entry >
Date:
2-1-2019
Number of Hours:
4.00
Manual Reference:
14.2
Brief Description:
Sand fill and prime
Well after doing everything but working on the plane I’m back at it. I had stopped work last year on filling and sanding a few items that needed fixing. The wing to strake and cowling extensions are ready for final work and then paint.
Strake to wing fixed and primer
Extensions are done on cowling
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
VELOCITY- XLRG Home
Category
# Logs
# Hours
All
847
2528
Brakes
3
10
Bulkheads
1
1
Canard/Elevator
49
122
Control System
17
58
Doors/Windows
78
192
Electrical/Instrumen
21
66
Engine/Propeller
141
432
Fairings
10
34
Filling to priming
155
533
Final Assembly/Finis
1
2
Fuel System
137
407
Fuselage
75
194
Inspections
1
1
Instrument Panel
7
20
Interior
52
192
Kit Purchase/Conditi
2
26
Landing Gear/RG
30
103
Painting
2
8
Shop
5
16
Time away from build
18
Tools
2
5
Wheels/Axles
4
10
Wings/Winglets
36
96
Copyright © 2001-2024 Matronics. All Rights Reserved.