KitLog pro

Powered By Kitlog Pro v2.0

JAMESs Web Site
' style=
Date:  6-20-2018
Number of Hours:  6.00
Manual Reference:  10.3.1
Brief Description:  Rigging the roll system to operate the ailerons.

I started the aileron extension by bolting the inside steel pipe to the aileron side first. I used # drills to get a very tight fit for the bolts. Once this was done the aileron was ready to slide into place and the deflection was 1.5 inches. I used a broom handle with sandpaper on one side and a curved rat file on the other side. 1.5 hours later the tubing did not come in contact with anything and I had 3 inches in both directions. The manual calls for 2.5 inches when the linkage is set up correct and that is what I have when done setting this all up.
' style=

Aileron extension was bolted on.

Aileron extension was bolted on.

' style=

Hog the shit out of this hole.

Hog the shit out of this hole.

' style=

Set up and ready for bolts.

Set up and ready for bolts.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.