KitLog pro

Powered By Kitlog Pro v2.0

JAMESs Web Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  5-31-2018
Number of Hours:  6.00
Manual Reference:  12.4.2
Brief Description:  Worked on cowling. Prime, sand and fill 4 bids on

It has been very busy around the house so I only got a few hours here and there on the plane. The cowling was primed and filled and sanded then primed again. The next thing to do was to add a 4 bid lay-up to hold the back cowling into place at the cooling outlets to align. The cowling was torqued so heat was applied with lights before I removed the clamp that was holding the top and bottom in alignment for the bid to cure. I trimmed and sanded the out let. Micro and primer to finish this area is the next thing to do to finish this part. Next will be the rudder cables.
' style=

Sanded and ready for primer.

Sanded and ready for primer.

' style=

Cowling cooling opening connection.

Cowling cooling opening connection.

' style=

4 bids on this item.

4 bids on this item.

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.