Powered By Kitlog Pro v2.0
JAMESs Web Site
VELOCITY- XLRG
All
4-16-2018
< Previous Log Entry
Next Log Entry >
Date:
4-16-2018
Number of Hours:
3.00
Manual Reference:
13.3.2
Brief Description:
Bus bar for fire wall side.
It was time to work on the bus par for the engine area ground wile the glass is curing. I cut drilled and taped the bar then welded. Nut plats mounted to fire wall and bolted into place.
Connected to oil pan bolt.
Bus bar mounted to fire wall.
Nut plates holding into place.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
VELOCITY- XLRG Home
Category
# Logs
# Hours
All
847
2528
Brakes
3
10
Bulkheads
1
1
Canard/Elevator
49
122
Control System
17
58
Doors/Windows
78
192
Electrical/Instrumen
21
66
Engine/Propeller
141
432
Fairings
10
34
Filling to priming
155
533
Final Assembly/Finis
1
2
Fuel System
137
407
Fuselage
75
194
Inspections
1
1
Instrument Panel
7
20
Interior
52
192
Kit Purchase/Conditi
2
26
Landing Gear/RG
30
103
Painting
2
8
Shop
5
16
Time away from build
18
Tools
2
5
Wheels/Axles
4
10
Wings/Winglets
36
96
Copyright © 2001-2024 Matronics. All Rights Reserved.