KitLog pro

Powered By Kitlog Pro v2.0

JAMESs Web Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  11-19-2017
Number of Hours:  3.00
Manual Reference:  12.4.2
Brief Description:  Installed cowling and gapped for clearance.

Today I placed the cowling and installed the hinge pins and then gapped the areas to have 1/16 + for paint. I found they were hard to pull out with sanding dust and no oil. I will not add lubricant until painted. All hinges are sanded to a 45 so the slide into each other and this works fantastic for alignment.
' style=

Pins are in place. Works great

Pins are in place. Works great

' style=

Cowling in place.

Cowling in place.

' style=

Gapping the cowling.

Gapping the cowling.

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.