KitLog pro

Powered By Kitlog Pro v2.0

JAMESs Web Site
' style=
Date:  1-27-2017
Number of Hours:  5.00
Manual Reference:  15.2.7
Brief Description:  Anchor nuts and 3 bids on vertical panel

I worked on the rest of the anchor nuts, mounted the luggage shelf and the sides. Now it was time to clean up main panel and get ready to bid the center. I mixed up micro and added to both sides of the center joint and put the big lower main panel up into place and wiggled the bottom panel back and forth so the two sides would blend together. I used door wedges to hold into place and then it was time to add the 3 bids. Once curd I will bid the back. I have 1/8 all the way around for the upholstery and I hope this will be enough, if not I will adjust.
' style=

Anchor nuts done and stuff mounted

Anchor nuts done and stuff mounted

' style=

Dry fitting the back main panel

Dry fitting the back main panel

' style=

Fitted and 3 bids on the center

Fitted and 3 bids on the center

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.