Date:  10-5-2016
Number of Hours:  5.00
Manual Reference:  7.7.3
Brief Description:  Worked on spindles, brackets, foam reinforcement o

I adjusted the spindles so there is only 2 degrees off from the vertical line with no load. I have now idea if this is right at this point so I will ask the VOBA group if I’m in the ball park. I then lifted the landing gear by hand and found a few spots that needed sanding for clearance with the new blocks on the end of the gear legs.

I cut out the brackets that hold the doors on at the spindle with the plasma cutter. It did work well but I need to change to 240 volts to get all I can out of it.

I then cut foam and microed onto the doors and added 2 bids to stiffen the center section.
' style=

Adjusted spindles. Now 2 degrees no load

Adjusted spindles. Now 2 degrees no load

' style=

Plasma cut landing gear brackets

Plasma cut landing gear brackets

' style=

Reinforcement foam on doors

Reinforcement foam on doors