KitLog pro

Powered By Kitlog Pro v2.0

JAMESs Web Site
' style=
Date:  9-27-2016
Number of Hours:  2.00
Manual Reference:  7.6.2
Brief Description:  Glass in gear leg sockets

It was time to level the fuselage and get the sockets and gear legs ready for the sockets to be glassed into place. I used a thick paper to spread the sockets out a bit so the legs go in smoothly. Once it was cured and I cleaned things up I moved the legs in and out with back pressure to simulate air drag and it goes in and out very nice. I will let cure and glass up more in a few days.
' style=

2 bid on sockets

2 bid on sockets

' style=

I had tape to hold onto legs

I had tape to hold onto legs

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.