KitLog pro

Powered By Kitlog Pro v2.0

JAMESs Web Site
' style=
Date:  12-25-2015
Number of Hours:  2.00
Manual Reference:  6.8.2
Brief Description:  One bid on elevator end and dog house bottom

The elevators were not perfectly matched from one side to the other as to the distance from the fuselage so I added some foam and bided the 3 sides and it should look better now.

I am very happy with the way the dog house turned out. I will only have to add 1/16 filler to the bottom corners to blend with the fuselage. I added one bid to the bottom and will let set over night and trim tomorrow.

The dog house will be mounted using hinges with a removable rod this way no screws will be seen.

I will have to add a small amount of filler along the dog house to fuselage in places so the gap is 1/16 on both sides for primer and paint. I will also add at the center of the fuselage so the dog house does not sag.
' style=

Elevator end has been added too

Elevator end has been added too

' style=

One bid on dog house bottom

One bid on dog house bottom

' style=

One more time for this job

One more time for this job

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.