KitLog pro

Powered By Kitlog Pro v2.0

JAMESs Web Site
' style=
Date:  12-24-2015
Number of Hours:  2.00
Manual Reference:  6.8.2
Brief Description:  2 bid on inside of dog house @ canard.

Tonight after dealing with 3” (7) cm of snow I mixed up some micro and filled in the foam and laid down one bid and then wet out with the heat gun for better flow. The second was added , wetted then and peel-ply was added and taped back to round the corners and hold everything in place so it could be lowered into the fuselage. The corners are pushed in 1/32 – 1/16 under flush with the fuselage just incase it springs back out and if not then just a small amount of filler will be needed.
' style=

2 bid and peel-ply

2 bid and peel-ply

' style=

Corners are pushed in

Corners are pushed in

' style=

In 1/32- 1/16

In 1/32- 1/16

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.