Powered By Kitlog Pro v2.0
JAMESs Web Site
VELOCITY- XLRG
All
11-28-2015
< Previous Log Entry
Next Log Entry >
Date:
11-28-2015
Number of Hours:
1.00
Manual Reference:
10.1.2
Brief Description:
Trim base
I shaped some foam for the base an sanded everything up and did the 2 bid lay-up to hold in place
Again the bid will only lay down on rounded edges so that was the prep that needed to be done.
WOW 2,000 hours into the kit now!!!! I hope I'm over 1/2 way
Base in place
Trim plate next to fit up
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
VELOCITY- XLRG Home
Category
# Logs
# Hours
All
847
2528
Brakes
3
10
Bulkheads
1
1
Canard/Elevator
49
122
Control System
17
58
Doors/Windows
78
192
Electrical/Instrumen
21
66
Engine/Propeller
141
432
Fairings
10
34
Filling to priming
155
533
Final Assembly/Finis
1
2
Fuel System
137
407
Fuselage
75
194
Inspections
1
1
Instrument Panel
7
20
Interior
52
192
Kit Purchase/Conditi
2
26
Landing Gear/RG
30
103
Painting
2
8
Shop
5
16
Time away from build
18
Tools
2
5
Wheels/Axles
4
10
Wings/Winglets
36
96
Copyright © 2001-2024 Matronics. All Rights Reserved.