Powered By Kitlog Pro v2.0
JAMESs Web Site
VELOCITY- XLRG
All
11-28-2015
< Previous Log Entry
Next Log Entry >
Date:
11-28-2015
Number of Hours:
3.00
Manual Reference:
11.2.1
Brief Description:
Canard tip installation
The die grinder did some dinging for me and I kept trial fitting the ends until it was ready for attachment. I used T88 and flox for the tip attachment and bondo to hold the low area in place. I will work on clearances and glass next.
Die grinder got things ready
Bondo is holding things in place
2nd side was faster
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
VELOCITY- XLRG Home
Category
# Logs
# Hours
All
847
2528
Brakes
3
10
Bulkheads
1
1
Canard/Elevator
49
122
Control System
17
58
Doors/Windows
78
192
Electrical/Instrumen
21
66
Engine/Propeller
141
432
Fairings
10
34
Filling to priming
155
533
Final Assembly/Finis
1
2
Fuel System
137
407
Fuselage
75
194
Inspections
1
1
Instrument Panel
7
20
Interior
52
192
Kit Purchase/Conditi
2
26
Landing Gear/RG
30
103
Painting
2
8
Shop
5
16
Time away from build
18
Tools
2
5
Wheels/Axles
4
10
Wings/Winglets
36
96
Copyright © 2001-2024 Matronics. All Rights Reserved.