KitLog pro

Powered By Kitlog Pro v2.0

JAMESs Web Site
' style=
Date:  11-15-2015
Number of Hours:  3.00
Manual Reference:  14.2
Brief Description:  Fill and sand then fill and sand then Smooth Prime

Yesterday was a shop blow out and vacuum of all the dust. OMG the dust was every ware.
I filled the scratches, pinholes and low spots to get ready to sand in the morning. Sunday came early and the sanding and primer blocking was done with one more fill in spots.
I then sprayed Smooth Prime out over 2 hours while I did yard work.

Time to mount the elevators
' style=

Pinholes Scraches low spots

Pinholes Scraches low spots

' style=

4 coats of Smooth Prime

4 coats of Smooth Prime

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.