KitLog pro

Powered By Kitlog Pro v2.0

JAMESs Web Site
' style=
Date:  7-4-2015
Number of Hours:  4.00
Manual Reference:  14.2
Brief Description:  Fill and sanding on the control surfaces

It was a fill and sand day on the control surfaces. The shop is 25 Celsius 76 degrees so the bondo set up very fast. I have to clean the tools every time the stuff times out or I use what has been mixed.
Good results and it should take only 8 hours to get to a primer paint state.
' style=

Second round of filling on elevator

Second round of filling on elevator

' style=

Rudders got filling twice

Rudders got filling twice

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.