KitLog pro

Powered By Kitlog Pro v2.0

JAMESs Web Site
' style=
Date:  5-25-2015
Number of Hours:  6.00
Manual Reference:  2.7.2
Brief Description:  Glassed in Aileron wells tonight

Well tonight was a long one I finished prep sanding and got at glassing in the wells. I got my slurry mix just wet enough to paint on and then thickened with more micro balloons to radius some transition areas to eliminate air bubbles. I use my trusty heat gun to flow out the resin and get a saturated dry lay-up. I then would let cool and off to the wing and put in place. The hinge areas got 6 bid in total for the extra strength.
' style=

Slurry was painted on

Slurry was painted on

' style=

3 bid ready to go. Cooling off

3 bid ready to go. Cooling off

' style=

Wells area done & 3 bid on hinge areas

Wells area done & 3 bid on hinge areas

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.