KitLog pro

Powered By Kitlog Pro v2.0

JAMESs Web Site
' style=
Date:  3-15-2015
Number of Hours:  2.00
Manual Reference:  6.6.2
Brief Description:  Lay-ups for Instrument panel

Instrument panel was bondoed into place after leveling the fuselage and then the panel. Site was sanded and Acetone used for cleaning resin mixed and bushed onto site. I then started to wet out the 5 bid lay-up one at a time using the heat gun to flow out into the next one. The lay-ups were installed and peel-ply added again with the heat gun for flow out extra resin.
It was fun doing something other then fill and sand today.
' style=

Lay-ups in place

Lay-ups in place

' style=

Peel-ply on with heat gun

Peel-ply on with heat gun

' style=

Dog house 1 bid lay-up

Dog house 1 bid lay-up

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.