Instrument panel was bondoed into place after leveling the fuselage and then the panel. Site was sanded and Acetone used for cleaning resin mixed and bushed onto site. I then started to wet out the 5 bid lay-up one at a time using the heat gun to flow out into the next one. The lay-ups were installed and peel-ply added again with the heat gun for flow out extra resin. It was fun doing something other then fill and sand today.