KitLog pro

Powered By Kitlog Pro v2.0

JAMESs Web Site
' style=
Date:  11-8-2014
Number of Hours:  2.00
Manual Reference:  7.7.2
Brief Description:  Brake line prep

I bondoed the tube in place and had to use 5 minute to hold the ends to get ready for the micro and glass work. The job worked out good.
' style=

Bondo and 5 minute epoxy to hold in place

Bondo and 5 minute epoxy to hold in place

' style=

Mirco and 1 bid peel-ply added

Mirco and 1 bid peel-ply added

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.