KitLog pro

Powered By Kitlog Pro v2.0

JAMESs Web Site
' style=
Date:  10-7-2014
Number of Hours:  3.50
Manual Reference:  9.6.3
Brief Description:  Finish door area and front strake storage

I made a template from cardboard and then transferred to the piece that was cut out of the fuselage side because it will be stronger then one bid on each side stuff made for the fuel tanks (strakes).You never know who will grab this spot to pull them self into the plane. The 2 sides where bondoed into place.
I then sanded the cut line to 3/16 or bigger for the 2 bid to go on for the lay-ups at the door and front strake storage area.
I ground out the foam for the micro and prepped for 2 bid on the door and strake area.
' style=

Cut out storage front from fuselage side.

Cut out storage front from fuselage side.

' style=

Bondo in place

Bondo in place

' style=

Sanded out to 3/16 for glassing

Sanded out to 3/16 for glassing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.