KitLog pro

Powered By Kitlog Pro v2.0

JAMESs Web Site
' style=
Date:  3-20-2014
Number of Hours:  3.00
Manual Reference:  9.3.2
Brief Description:  Install flanges, fit baffles and fuel line made.

I got the 1 ½ “ fuel bulkhead flanges cut and fit for installation, everything was sanded and wet down with acetone for the flox to go onto. I applied the flox and used the clamps to hold in place.
It was time to work on the fuel line to the tank, so out came the flare tools and bender and got this done tonight.
Diner was the next project for the night stir-fry chicken for Cynthia and Salmon for me.
Time to come home from dance Cynthia dinner is ready.
' style=

Flanges installed and baffle work

Flanges installed and baffle work

' style=

Fuel line to tank

Fuel line to tank

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.