Brief Description: Installed fuel hard points, flange work
I made the fuel hard point yesterday so today I drilled the fuselage and then cut out the squares for the aluminum to fit into the inside of the fuselage with my dermal tool. I got the flange ready to be floxed on to the side of the fuselage. To finish the hard points I did a 2 bid lay-up on top with peel-ply. I still had some time in the evening to make some flanges so off to the resin pump for more good stuff. I did 14’ of bid tape and let set for 45 minutes then I covered with plastic on top. 2X4 are on top the plastic to hold down